Lithuania, Rokiškis Installation of biofuel boilers (2 x 5,0 MW) with condensing economizers
Lithuania, Venta Construction of the biofuel boiler house (1 x 2,0 MW) with condensing economizer
Lithuania, Anykščiai Reconstruction of the biofuel boiler house (1 x 4,0 MW) with condensing economizer
Lithuania, Kaunas Construction of steam boiler house (1 x 15,773 t/h) (natural gas)
Lithuania, Panevėžys Overhaul of heat supply pipelines
Lithuania, Švenčionys Installation of heat supply pipelines
Lithuania, Akmenė Reconstruction of the boiler house (2 x 0,380 MW) with condensing economizer (natural gas)
Lithuania, Vilnius Construction of the biofuel boiler house (2 x 8,0 MW) with condensing economizer
|